"Delta Star" AD

Preparation of foundation for installation of MKPU

251217-4-fvets dinamo 10,0 VAT mkru

As a continuation of the project for the implementation of the connection of a photovoltaic park with the electricity distribution network, foundation preparation and casting was carried out, for part of the future facilities.

It will be used for the installation of MKPU 20kV.

Through him, the connection between the overhead and cable power line 20kV will be made, , plant commutation and electricity metering.