Contracts and projects in 2025.
-
Construction of a system for interconnection of photovoltaic plants with an individual power of 5000 kW from the municipality of Suhindol to the substation Pavlikeni 20/110kV.
-
Purchase of suitable land for the construction of new service bases in the country;
-
Construction of new 20kV power lines and 4 connected to it. BKTP for connecting a photovoltaic park with a capacity of 10,000kVA;
-
Participation in the overhaul of the electrical equipment of the Installation and Facilities for the Production of Sulfuric Acid in “Aurubis Bulgaria” AD;
-
Participation as a partner company in construction activities of a 110kV cable power line.
-
Participation in carrying out major repairs of the electrical equipment of Dry Electric Filters in “Aurubis Bulgaria” AD;
-
Participation in a long-term program to replace electric motors with ones having a higher energy efficiency class;
-
Construction of electrical installations in public buildings and commercial establishments;
-
Engineering and supply of equipment for power plants;
-
Putting a photovoltaic power plant with 860kW power;
-
Making an investment project to build 2 pcs. Photovoltaic plants for industrial needs and their complaint with electricity users;
-
Displacement of substations and their adjacent facilities with a power of 4000kVA on an industrial production site.
-
Development of a project for a new cable route and laying of 110kv cable.
-
Cleaning of cable routes of exploitative cables cables cf.n and n.n.
-
Participation in capital repair activities of industrial production and processing of non -ferrous metals;
-
Delivery and commissioning of an electric diesel generator for a spare power supply with a power of 200kva;
-
Exploration activities to build a new 20kV cable power line, 9800m long. and a power of 3.5mw;
-
Measurement of electrical safety parameters and consultations in the elimination of identified problems;
-
Construction and commissioning of electrical installations of domestic users.