"Delta Star" AD
Participation in the renovation of sulfuric acid production facilities

"Delta Star" AD - part of the specialist team, participants in the large-scale overhaul of the Honey Mining Company "Aurubis Bulgaria"
The honey company "Aurubis Bulgaria", part of the German Aurubis group, completed the largest overhaul since the privatization of the plant in April 1997 year., this way. For two months they were executed in total 120 value project 230 million. BGN, the company announced. These projects are part of the company's large investment program for general 800 million. BGN, which also includes expanding the production of pure copper.-
Major projects:
-
-
- The overhaul activities have been in preparation for more than a year, since in April 2024 the company officially announced its four-year investment program.
- It will be invested in total 800 million. BGN. until the end of 2027 year. In the execution of the capital repair, during the main period from May 5, 2025. until July 12, 2025, were engaged in total approx 2000 specialists and workers from 12 countries, apart from the team of "Aurubis".
- A key project was the complete reconstruction of the Melting Furnace, which is a basic unit in metallurgical production.
- Second major project, in which DELTA STAR AD takes a direct part in the "Electrical systems" part - this is the replacement of two dry electrofilters (SEF-1 and SEF-2), with new ones, which improves the environmental performance of the plant.
- Third main and important project for AURUBIS, in which DELTA STAR AD also takes a direct part, is the largest upgrade of the Sulfuric Acid Production facilities (PSK-1 installation), which is obtained as a by-product, from 20 years ago.
-
-
-
- Construction of a new cable route with WSL400/105 cable grid, along an existing cable trestle, with a total length 400 meters.
- Pulling and laying of LAPP ÖLFLEX power supply cables® CLASSIC 100 H, 5G150 sq.mm and 4G185 sq.mm, from the LV distribution system of an existing in-plant P/st, directly to the most powerful consumers, driven by electric motors with power in the order of 250 – 400 kW
- Installation of power distribution and control el. board.
- Construction of cable routes, deviations from the main ones, for pulling and laying power and control cables.
- Mounting, connection and testing of control devices and instruments (Thermal twins, Pressure transmitters, Manual samples from different areas of the system, etc.), part of the SCADA and instrumentation systems of "Sulphurous Acid Production". The activities are carried out with the assistance of colleagues from the Aurubis team from Main control room of PSK-1..
- Construction of a new grounding system with a 40/4mm stainless steel bar, in order to equalize the potentials between the existing grounding installations of the internal plant P/st and the main facilities of PSK-1 - Contact Apparatus, Heat exchangers and gas pipelines.
-