Reconstruction of the lighting system in a cave "Snow White"

260429-21 Snow White Cave

The reconstruction of the cave lighting system has been completed "Snow White" during which the following activities were carried out:

  • 7 units are installed. new power supply and system control panels;

  • Cables with a total length of 2870m were laid and installed;

  • They are installed together 117 new emergency and main lighting;

  • Complete reworking of the Low Voltage Main Switchboard;

  • Installation of a new UPS with a battery providing uninterrupted lighting power in the event of a power outage for a certain period of time.